City of Brampton Logo

Downtown Brampton Streetscape Project

Page Banner

​​​​​​​​​​​​Start Date: September 2024
End Date: December 2027

The City of Brampton is starting the Downtown Brampton Streetscape work along Main Street (between Nelson Street and Wellington Street) and Queen Street (between Mill Street and Chapel Street).

The work involves removal of the existing sidewalk, new infrastructure installation, catch basin relocations, temporary traffic signals and installation of granite pavers and curbs.

Construction on these streets will take place at various times between 2024 and 2027. Work will be phased, requiring segmented closures on one side of the street.

The City is committed to ensuring safe and accessible walkways and entryways are maintained for everyone during construction. Any temporary access disruptions will be communicated promptly.

Access to local businesses will be maintained during construction. For more information, visit the Downtown Brampton BIA website.

​This project is a key element in the Council-approved initiative to revitalize the downtown core, aimed at enhancing public spaces, supporting economic development and improving the quality of life for residents.