This project invests in a variety of upgrades to ensure a good State of Repair of facility assets.  The project will be managed in two phases:

Phase 1 (September – November 2024):
  • Asphalt paving and repairs across various parking lot areas
  • Power distribution equipment install
  • Enhancing exterior lighting 

Phase 2 (January – May 2025):
  • Upgrading the building elevator
  • Power distribution upgrades
  • HVAC replacements

  • Q1 2024: Design 
  • Q4 2024: Construction commenced 
  • Q2 2025: Estimated project completion